Coroner Hassan Shah · Northamptonshire · in 3 recurrence links
No published response from this organisation found.
Coroner Lindsey Tonks · Staffordshire and Stoke on Trent · in 2 recurrence links
No published response from this organisation found.
Coroner Robert Cohen · Cumbria
No published response from this organisation found.
Coroner Daniel Howe · Staffordshire and Stoke-on-Trent
No published response from this organisation found.
Coroner Rosamund Rhodes-Kemp · Hampshire, Portsmouth and Southampton · in 3 recurrence links
Response · 1 stated action
2025-0374-Response-from-National-Highway-Agency.pdf ↗“The first drainage flood risk site visit of financial year 1 April 2024 to 31 March 2025 was ordered on 23 April 2024 with a six-month window for completion. The work was completed on 31 August 2024.”
Coroner Sean Cummings · Milton Keynes
No published response from this organisation found.
Coroner N J Mundy · South Yorkshire East · in 1 recurrence link
No published response from this organisation found.
Coroner Alan Blunsdon · North West Kent
No published response from this organisation found.
Coroner Emma Serrano · Staffordshire · in 4 recurrence links
No published response from this organisation found.
Coroner Anne Pember · Northamptonshire
No published response from this organisation found.
Coroner Adrian Farrow · Manchester South · in 1 recurrence link
No published response from this organisation found.
Coroner Guy Davies · Cornwall and Isles of Scilly
No published response from this organisation found.
Coroner Lorraine Harris · East Riding of Yorkshire and City of Kingston Upon Hull
No published response from this organisation found.
- Emma Harper: Prevention of Future Deaths Report11 Sept 2024
Coroner Michael Pemberton · Manchester West
No published response from this organisation found.
Coroner Martin Fleming · West Yorkshire (Western) · in 1 recurrence link
No published response from this organisation found.
Coroner Sean Cummings · Milton Keynes · in 1 recurrence link
No published response from this organisation found.
Coroner Nicholas Shaw · Cumbria · in 2 recurrence links
No published response from this organisation found.
Coroner Sean Cummings · Milton Keynes · in 2 recurrence links
Response · 1 stated action
2023-0543-Response-from-Highways.pdf ↗“Further temporary signing has been put in place at the exit point of the A5 off slip at the Little Brickhill junction in the form of two large 1200mm 'No Entry' signs on A-frames on each side of the carriageway (Traffic Signs Regulations and General Directions (TSRGD), Diagram 616 No entry for vehicular traffic). These signs are intended to provide mitigation against further wrong way driving incidents while a full safety review of the junction has been undertaken.”
Coroner Anne Pember · Northamptonshire · in 5 recurrence links
Coroner Anne Pember · Northamptonshire
No published response from this organisation found.
Coroner Geoffrey Sullivan · Herefordshire · in 1 recurrence link
No published response from this organisation found.
Coroner Richard Travers · Surrey
Response · 4 stated actions
2023-0003-Response-from-National-Highways.pdf ↗“CP have commissioned a review from WSP, an independent engineering consultant, of CPS drainage maintenance arrangements for all the roads for which they are responsible.”
“With CP, NH have commissioned CPS to review the effectiveness of the existing fixed warning sign to identify whether any measures are possible, within the legislative provisions that govern signage, to enhance the visibility of the sign.”
“With CP, NH has commissioned WSP to undertake an independent review of the drainage system in the vicinity of Clacket Lane to identify whether any improvement could be made which would be likely to reduce the risk of flooding on the carriageway.”
“With CP, NH has commissioned CPS, with support from a contractor, Milestone Infrastructure, to consider the viability of reprofiling the carriageway to shorten the drainage flow paths across the carriageway.”
Coroner James Dillon · Mid Kent and Medway · in 2 recurrence links
Response
Response · 4 stated actions
2022-0399-Response-from-National-Highways-Limited.pdf ↗“South East Regional Operations Centre (SEROC) set variable message signs to display”
“170 metres of combined kerb drainage jetted, 200 metres x 2 Acco drains jetted and a full CCTV drainage survey carried out”
“200 metres of combined kerb drainage jetted and cleaned; ▪ 150 metres of centre reserve drainage channel cleaned;”
“M20 Medway and Allington Deck Refurbishment scheme is due to be delivered between June and July 2023”
Coroner Christopher Wilkinson · Hampshire, Portsmouth and Southampton · in 1 recurrence link
No published response from this organisation found.
- Nargis Begum: Prevention of Future Deaths Report16 Sept 2022
Coroner Nicola Mundy · South Yorkshire East · in 1 recurrence link
No published response from this organisation found.